2017年10月10日星期二

IBM POWER8 Scale-out V1 C9010-251 free questions

Passcert is a professional IT training website to make the training scheme for IBM certification C9010-251 exam. At first you can free download part of IBM POWER8 Scale-out V1 C9010-251 free questions about IBM certification C9010-251 exam on Passcert as a try, so that you can check the reliability of our IBM POWER8 Scale-out V1 C9010-251 free questions. Generally, if you have tried Passcert products, you'll very confident of our products.
Share some IBM Certified Technical Sales Specialist C9010-251 exam questions and answers below.
A customer would like a development Power S824L running PowerVM for tree three Linux partitions. Each partition needs redundant LAN and SAN adapters. 
Which solution supports the minimum requirement? 
A. Two 146GB disk drivers 
Two 4-port LAN adapters 
Two 4-port SAN adapters, 
One VIO Server 
B. Two 146GB disk drives 
Two 4-port LAN adapters 
Two 4-port SAN adapters 
C. Six 146GB disk drives 
Six 4-port LAN adapters 
Six 4-port SAN adapters 
D. Four 146GB disk drives 
Four 4-port LAN adapters 
Four 4-port SAN adapters 
Two VIO Servers 
Answer: A

A client would like to use Power servers to reliably manage large volumes of structured and unstructured data using the Hadoop open source framework. Which IBM offering will satisfy their requirement? 
A. IBM Infosphere Clinical Analytics 
B. IBM Infosphere Streams 
C. IBM Infosphere Master Data Management 
D. IBM Infosphere BigInsights 
Answer: D

What is a benefit of IBM POWER8 support for little-endian (LE)? 
A. Ability to run programs compiled for x86 processors 
B. Support of older 32-bit applications 
C. Little-endian has better performance than Big-endian 
D. Ease of porting programs from other architectures 
Answer: A

What standard feature was added to the 4-core POWER8 S814 to improve the RAS capability when compared to a 4-core POWER7 720? 
A. Alternate Processor Recovery 
B. Chipkill Memory 
C. PCIe Hot Plug Support 
D. RAID 0 
Answer: C

A customer wants to deploy SAP HAHA on IBM Power Systems. Which operating system is supported? 
A. IBM i V7R2 
B. SUSE SLES 11 
C. AIX 7.2 
D. Ubuntu 14 
Answer: B

A customer wants to save licensing costs. 
The following VMs are to be consolidated: 
- VM1 will run IBM i with 1 CPU 
- VM2 will run AIX i with 1 CPU 
- VM3 will run AIX i with 1.5 CPU 
- VM4 will run Linux with 1 CPU 
Which of the following will provide the consolidation at the least cost? 
A. S812 with 8 CPU 
B. S824 with 8 CPU 
C. S822 with 8 CPU 
D. S812L with 8 CPU 
Answer: C

A customer is considering a purchase of an S812L. One PCIe Gen3 I/O Expansion Drawer is required to meet the I/O adapter requirements. 
How many rack units (EIA) are required? 
A. 7 
B. 8 
C. 4 
D. 6 
Answer: D

Which of the following are required in order to utilize Live Partition Mobility? 
A. PowerVM Enterprise Edition 
SAN attached disk 
Virtual Ethernet 
B. Dedicated processors 
PowerVM Enterprise Edition 
Virtual Ethernet 
C. Dedicated processors 
Dual VIO Servers 
SAN attached disk 
Virtual Ethernet 
D. Dual VIO Servers 
PowerVM Enterprise Edition 
SAN attached disk 
Two virtual processors 
Answer: A

Which LC server is delivered with four available (unoccupied) CAPI-enabled slots? 
A. S822LC Commercial 
B. S812LC Cloud 
C. S812LC Cluster 
D. S822LC High Performance Computing (HPC) 
Answer: A

A customer has 20 partitions on a POWER8 system and would like to additional storage from their non-IBM SAN to eh of the partitions. The cost of the licenses for the drivers and multipath for all the partitions is higher than the current budget limits. 
Which of the following technologies will help with reducing the driver and multipath software licensing requirement? 
A. SAS 
B. NPIV 
C. SSD 
D. vSCSI 
Answer: D

What component of PowerKVM provides I/O virtualization? 
A. virsh 
B. QEMU 
C. Kimchi 
D. IPMI 
Answer: B

An IBM Power S824 server has Update Access Key valid through 01-01-2017. 
Which is a valid statement regarding firmware updates? 
A. Firmware updates will be restricted to IBM after 01-01-2017. 
B. Firmware Updates e orgy available le via the AS MIL and not the HMC after 01-01-2017 
C. Firmware updates released prior to 01-01-2017 d be allowed, but those released after that date will not 
D. Firmware updates will not be restricted, but the server will display a message stating there is no maintenance contract in place. 
Answer: C

An AIX customer wants to be sure they can update their SAN multipath drivers with a minimal amount of time and impact on LPARs, while still being able to perform Live Partition Mobility operations. 
Which disk connectivity technology supports these requirements? 
A. vSCSI 
B. NPIV 
C. iSCSI 
D. SAS 
Answer: B

In the event of a disaster, a customer wants to automatically failover their Power System nodes that are running AIX. The customer will locate the servers in two data centers. 
Which IBM product will satisfy the customer¡¯s requirement? 
A. PowerHA SystemMirror Enterprise Edition 
B. IBM Metro Mirror 
C. Geographic Logical Volume Manager 
D. IBM Spectrum Scale (GPFS) 
Answer: A

What is the maximum number of PCIe I/O slots available with one PCIe Gen3 /O Expansion Drawer? 
A. Four with one fanout module 
B. Seven with one fanout module 
C. Twelve with two fanout modules 
D. Fourteen with two fanout modules 
Answer: C

What is an advantage of sing SR-IOV as compared to using a SEA (Shred Ethernet Adapter) through VIOS? 
A. It requires little bandwidth per virtual adapter. 
B. It allows for direct access I/O. 
C. It enables LPM. 
D. It provides port security. 
Answer: B

What is an advantage, for the Power System administrator, of using NPIV for using VPIV for storage virtualization? 
A. Optimizes mapping of shared storage pools. 
B. Reduces the effort of adding storage to the client partitions. 
C. Allows easier mapping to virtual SCSI adapters in VIOS. 
D. Provides easier provisioning for SR-IOV adapters. 
Answer: B

A client purchased one Power S822 server to run their AIX workloads in virtual partitions. They intend to consolidate their Linux workloads to this POWER8 server in the future as well. 
Which virtualization solution will satisfy this requirement on this server? 
A. PowerKVM for both AIX and Linux workloads 
B. PowerVM for both AIX and Linux workloads 
C. OPAL for both AIX and Linux workloads 
D. KVM for both AIX and Linux workloads 
Answer: B

What wodd a customer need to test the Active Memory Expansion feature? 
A. A trial AME code from the CoD website 
B. PowerVM Enterprise 
C. A temporary key frorn the IBM Key Center 
D. PowerVM Standard 
Answer: A

Which technology provides simple virtualization for Ethernet, with quality of service controls that specify minimum bandwidth per partition? 
A. SR-IOV (Single Root I/O Virtualization) 
B. HEA (Host Ethernet Adapter) 
C. CAN (Converged Network Adapter) 
D. SEA (Shared Ethernet Adapter) 
Answer: A


In the IT industry, the C9010-251 Power Systems with POWER8 Scale-out Technical Sales Skills V1 certification exam is very important, it can provide you with good employment opportunities. IBM IT certification is recognized worldwide as the most advanced certification. We provide IBM POWER8 Scale-out V1 C9010-251 free questions is based entirely on objective type questions and answers. Want to get this certification by learning the Study Material for C9010-251 exam, we provide learning materials easily obtain exam certificate. We provide IBM POWER8 Scale-out V1 C9010-251 free questions, can make you successful pass your test.

没有评论:

发表评论